摘要
介绍了万家寨引黄工程南干线6#隧洞安全监测3#电缆竖井工程的施工过程,并就施工中遇到的问题进行了探讨,总结和修正了一些工程技术参数,对类似工程施工提供了参考依据。
This paper introduces the construction process of certain shaft eng in eering on south trunk line of Wanjiazhai Yellow River Diversion Project (YRDP), probes into the problems occurring in the construction, and sums up and corrects some engineering technical parameters, providing reference data for similar eng ineering construction.