摘要
从工、料、机、环境、施工方法等方面 。
A synthetic analyze is made on the management of project and cost in the Victory Bridge Renewing Work, including manpower,material,machines,environment and construction method.
出处
《山西焦煤科技》
2003年第5期34-35,共2页
Shanxi Coking Coal Science & Technology