摘要
通过对目前杏北油田地面工程面临的控制能源消耗的难度增加;腐蚀老化问题严重;注水量平衡难度加大;含油污水水质不达标;部分现有工艺技术不适应生产需要等问题的分析,针对原油集输系统、污水处理系统、注水系统及供配电等,提出了相应的技术解决措施及现场试验研究。
Analysed the increasing trouble of the energy consumption control,the heavy corrosion aging,the trouble of injection water balancing,the off spec of oily water quality,the unconformity to the production needs of some existing technology. Against the oil gathering and transportation system,waste water treatment system,water injection system,power supply and distribution system,worked out respective technical measures and the site experimental research. 14
出处
《石油规划设计》
2003年第4期14-16,共3页
Petroleum Planning & Engineering