摘要
朝阳沟油田属于低渗透油田,开采难度大,自然递减率高。进入开发中后期,地面系统负荷率逐年降低,能耗高,操作成本逐年上升,需对地面工程系统进行综合性的优化调整,统筹安排,并有针对性的开展前期试验,提高油田综合开发效益。
Chaoyanggou oilfield is of the low permeable oilfields,the recovery is trouble and the natural decline rate is high. By entering the middle-late development period,the load rate of the surface system is decreasing from year to year,the energy consumption is high,The operating cost is increasing from year to year. It is necessary to carry out comprehensive optimized adjustment and overall planning for the surface engineering system,and to carry out pilot experiment accordingly with the purpose to raise up the comprehensive development effectiveness of the oilfield. 35
出处
《石油规划设计》
2003年第4期35-37,共3页
Petroleum Planning & Engineering