摘要
从运行维护的角度,对东莞地区变电站所使用的变电站综合自动化系统与常规远方终端单元(RTU)的结构、特点、运行情况进行比较分析,指出各自的优缺点,并对存在的问题提出了一些改进措施。
A comparative analysis is made on the structure,features,operation,merits and demerits of the integrated automation system and remote terminal unit (RTU) used in substations in Dongguan.Some measures for improvement are presented in view of the existing problems.
出处
《广东电力》
2003年第3期1-3,共3页
Guangdong Electric Power