大亚湾核电站松动部件监测系统的误报警处理 被引量:3

Treatment of the False Alarms of the Loose Part Monitoring System in Daya Bay Nuclear Power Plant
下载PDF
导出
摘要 大亚湾核电站松动部件在线监测系统投入运行以来,曾因频繁误报警而不断地改进。在2号机组第四燃料循环系统出现了持续的误报警,因系统存在设计缺陷,在停机小修期间采用加速度传感器的方法进行故障诊断。结果表明,持续报警不是由松动部件引起的,它来自主泵的噪声,系统本身的缺陷需要进行改造。 Since its operation, the loose parts monitoring system in Daya Bay nuclear power plant has been modified for many times to reduce the false alarms. Continues false alarms occurred for the fourth fuel cycle for unit 2. Diagnosis was made by use of accelerometers and on-line acoustic sensors, and the result shows that the false alarms are triggered by the noise of the primary main pumps but not by the loose parts. The current system should be modified to remove the design defect.
出处 《核动力工程》 EI CAS CSCD 北大核心 2003年第4期398-400,共3页 Nuclear Power Engineering
关键词 松动部件 核电站 试验 频谱 时域波形 Loose parts Nuclear power plant Test Spectrum frequency Time response
  • 相关文献

同被引文献19

引证文献3

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部