摘要
山西省万家寨引黄工程总干三级泵站出水压力竖井为钢筋混凝土衬砌 ,采用了液压滑升模板施工 ,节省了多次立模和拆模工序 ,加快了施工进度。实践证明 ,滑模在工艺和技术上先进 ,经济上合理 。
The outfall pressure shaft well in the third-step pumping station of main canal of Wanjiazhai Huanghe Water Transfer Project in Shanxi Province is lined with reinforced concrete and constructed by using hydraulic climbing form. It is proved in practice that the hydraulic climbing form is an advanced construction technology in the same kind of water conservancy project owing to saving work processes and speeding up construction schedule.
出处
《水利与建筑工程学报》
2003年第2期31-34,64,共5页
Journal of Water Resources and Architectural Engineering