两种甩负荷试验方法的比较 被引量:2

Comparison of two load rejection test methods
原文传递
导出
摘要 分别介绍了邹县电厂 1号机组、华德电厂 4号机组经过改造后进行常规法和测功法甩负荷试验的有关情况 ,并对甩负荷试验中临时技术措施、机组运行方式、旁路的投入 ,以及个别保护的解除等一些技术问题进行了分析与探讨。认为 OPC( 1 0 3 %超速保护 )动作准确是甩负荷成功的关键 ,必须在甩负荷前对 OPC逻辑控制进行认真、仔细的检查 ,同时要尽量减少测量试验信号的迟缓 。 The load rejection test procedures of retrofitted units performed by routine method and power measuring method were expatiated. Some technical problems about temporary technical measures, operation mode, operation of by pass system and cut off of some protection devices were discussed. It was considered that the accurate operation of OPC is key to a successful load rejection test and the OPC logical control should be checked carefully before load rejection tests. At the same time, any delay in test signal measurement should be avoided and the safety operation of the unit should not be effected.
作者 刘浩 张文慎
出处 《华东电力》 北大核心 2003年第7期61-63,共3页 East China Electric Power
关键词 汽轮机 调节系统 调速系统 甩负荷试验 OPC retrofitted unit load rejection test technical measure
  • 相关文献

同被引文献11

引证文献2

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部