摘要
文章介绍了± 5 0 0kV龙政线芜湖长江大跨越张力放线施工中 ,牵张设备、牵引绳、放线滑车等的受力计算 。
The paper describes the calculation of forced acted on the pulling and tensioning devices, pulling rope and stringing pulleys, etc. during the tension stringing construction for Wuhu Yangtze River Large Crossing in±500 kV Long-Zheng transmission line. Concerned calculations required for the tension stringing of the large crossing before operation are also mentioned.
出处
《电力建设》
北大核心
2003年第7期31-32,共2页
Electric Power Construction