摘要
结合工程实践,介绍STRATA应力吸收层的施工工艺。针对湖北夏天炎热冬天寒冷的气候特点,建议高等级公路罩面优先选择STRATA应力吸收层。
The construction technique of STRATA stress absorption system is introduced by practical engineering example.Since it has many advantages such as good effects, convenient and rapid construction, the STRATA stress absorption system should have priority to be used in surface coating of high-order road.
出处
《公路交通科技》
CAS
CSCD
北大核心
2003年第3期19-22,共4页
Journal of Highway and Transportation Research and Development