摘要
详细介绍了2000m^3高压天然气球罐工程的制造、安装过程,并指出每个环节的控制要点。球罐投入运行后,工作状况良好。
This paper introduces the manufacturing , installation process of the 2000m3 high pressure natural gas storage pot, as well as the control point for each link. It is working perfect after the storage pot get into production.
出处
《重型机械科技》
2003年第2期48-51,共4页
Heavy Machinery Science and Technology