摘要 本文介绍了在宁夏钢铁厂补充水源地工程中,针对可建井地段狭窄与要求近厂等特点,选择了近河干扰布井方案,经勘察试验和生产表明是可行的。 This paper introduces the project of the supplementary water resource station of Ningxia steel warks. Considering the slenderners of the well location ground, the requirement of near-by water supply for the plant and other characteristics, the river-side interference well location scheme is adopted. After the site investigation; testing and operation, it is proved that the scheme is feasible.
作者 胡效先
出处 《勘察科学技术》 1992年第4期16-18,共3页 Site Investigation Science and Technology