长梁山隧道是我国第二条特长双线电气化铁路隧道,在地质超前预报、水平层状围岩开挖支护、大断层超前预注浆技术、机械化配套及管理、长距离大直径软管通风技术、综合防排水技术开展科学研究,取得了6项科研成果,研究开发了一整套适应复杂地质软弱围岩长大隧道的综合施工技术。
Changliangshan tunnel is the second extremely long doubletrack tunnel in China. Such technologies are studied as forecast of geological conditions, excavation and support of the horizontal stratum shaped surrounding rock, preejection of mortar into big fault, use and management of complete set of tunneling machines, longdistance bigdiameter hose ventilation technology and integrated antiflood and drainage technology. Six research fruits have been achieved and a whole set of integrated construction technologies of excavating long tunnels under complicated geological and soft surrounding rock has been developed.
出处
《中国铁道科学》
EI
CAS
CSCD
北大核心
2003年第4期142-144,共3页
China Railway Science
关键词
隧道
复杂地质
地质预报
施工技术
Tunnel
Complicated geological condition
Geological forecast
Construction technology