本文根据寒冷地区水利水电工程施工期所遇到的冰问题,提出了相应的对策,为以后类似工程施工期安全渡凌提供了分析思路和可供借鉴的工程措施及非工程措施。
The paper puts forward the corresponding countermeasure in according with existed ice issue of hydraulic and hydroelectric project during construction in the frigid zone for provide the thinking and the reference engineering measures and non - engineering measures to deal with ice slush during project construction.