摘要
在分析水电工程施工期生活污水特点的基础上 ,考虑水电工程实际情况 ,结合市镇小区污水处理的经验 ,提出采用A/O法及处理系统主体采用一体化设备 ,根据工程具体情况 ,采用集中处理系统或分散处理系统的处理模式 。
On the basis of analyzing the sanitary sewage features of hydropower projects during construction period and in consideration of the actual conditions of hydropower project and the experience from the wastewater treatment in towns and villages, the A/O method and the integral equipment of treatment system has been used. The treatment system may be integrated system or disperse system, which can make the treated sewage reach grade-II discharge standard.
出处
《水力发电》
北大核心
2003年第7期20-22,共3页
Water Power
关键词
水电工程施工
生活污水
污水处理
集中处理系统
水力发电工程
sanitary sewage , A/O method, integrated treatment system, disperse treatment system, construction period, hydropower project