对水电工程施工期生活污水处理模式的探讨 被引量:1

Discussions on sanitary sewage treatment method of hydropower projects during construction period
下载PDF
导出
摘要 在分析水电工程施工期生活污水特点的基础上 ,考虑水电工程实际情况 ,结合市镇小区污水处理的经验 ,提出采用A/O法及处理系统主体采用一体化设备 ,根据工程具体情况 ,采用集中处理系统或分散处理系统的处理模式 。 On the basis of analyzing the sanitary sewage features of hydropower projects during construction period and in consideration of the actual conditions of hydropower project and the experience from the wastewater treatment in towns and villages, the A/O method and the integral equipment of treatment system has been used. The treatment system may be integrated system or disperse system, which can make the treated sewage reach grade-II discharge standard.
作者 谭奇林
出处 《水力发电》 北大核心 2003年第7期20-22,共3页 Water Power
关键词 水电工程施工 生活污水 污水处理 集中处理系统 水力发电工程 sanitary sewage , A/O method, integrated treatment system, disperse treatment system, construction period, hydropower project
  • 相关文献

参考文献2

  • 1谭奇林.张河湾抽水蓄能电站施工期环境保护与水土保持实施规划[R].,2002..
  • 2孙力平 等.污水处理新工艺与设计计算实例[M].北京:科学出版社,2002..

共引文献2

同被引文献10

引证文献1

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部