摘要
208m跨通天桥工程地处海峡,设计采用了空间预应力索桁架新型结构,本文介绍其结构与施工技术。
Tongtian Bridge project,whose span is 208m,located in a channel.Engineers adopted a new structure,the spatial prestressed cable truss,in the design of this bridge.In this article,the author introduces its structure and construction technologies.
出处
《施工技术》
CAS
北大核心
2003年第7期30-32,共3页
Construction Technology