摘要
采用数值模拟和水力学模型 ,对沾化电厂扩建后徒骇河供水能力进行了定量计算。通过分析取水前后典型站位及河道沿程水位、流量的变化 ,对影响取水的因素进行了初步探讨 ,对增大取水量的工程措施提出了建议。
The quantitative computation of the Tuhai River water supply capacity after extending the Zhanhua power plant was made by using numerical simulation and hydraulic model. The factors affecting the water intake were explored by analyzing the changes in stage and discharge at typical stations and along the river channel, and the engineering measures for increasing the water intake quantity are also proposed.
出处
《海岸工程》
2003年第2期15-21,共7页
Coastal Engineering