1Borichevsky G. Bidding Mechanisms for Realizing Hydro Efficiencies in Market Operations. In: 2002 IEEE Power Engineering Society Summer Meeting, Vol 3. Piscataway(NJ): IEEE, 2002. 1301.
2Conejo A J, Arroyo J M, Contreras J, et al. Self-scheduling of a Hydro Producer in a Pool-based Electricity Market. IEEE Trans on Power Systems,2002,17(4): 1265-1272.
3ShawwashZ K, Siu T K, Russell S O D. The B. C. Hydro Short Term Hydro Scheduling Optimization Model. IEEE Trans on Power Systems, 2000, 15(3):1125-1131.
4Conejo A J, Arroyo J M, Contreras J, et al. Self-scheduling of a hydro producer in a pool-based electricity market [J].IEEE Transactzons on Power Systems, 2002,17 (4):1265-1272.
5Shawwash Z K, Siu T K, Russell S O D. The B. C. Hydro short term hydro scheduling optimization model [J]. IEEE Transactzons on Power Systems, 2000,15 (3): 1125-1131.
6Borichevsky G. Bidding Mechanisms for Realizing Hydro Efficiencies in Market Operations. In: Proceedings of 2002 IEEE Power Engineering Society Summer Meeting,Vol 3. Chicago (IL): 2002. 1301
7张英贵.电力系统中水电厂群日优化运行.武汉:华中理工大学出版社,1994
8Shawwash Z K, Siu T K, Russell S O D. The B.C.Hydro Short Term Hydro Scheduling Optimization Model. IEEE Trans on Power Systems, 2000, 15(3):1125~1131