介绍了莲花水电站137.5 MW水轮发电机的主要结构及主要部件的安装工艺和安装特点,重点阐述了该水电站水轮发电机定子安装、转子安装、下机架及推力轴承安装、机组轴线检查及机组中心的调整。该水轮发电机投运后,运行平稳,满足设计要求。
The primary construction of 137.5 MW water furbogenerators at lotus hydranlic power station,and the installation processes and installation special features of its major parts and components are discussed in detail with emphasis on installations of stators and rotors,bottom framework and thrust bearings,check of generators fox axis, and adjustment of generator centre. The steady operation of this water turbogenerator satisfies the design requirement.
出处
《黑龙江电力》
CAS
2003年第4期280-283,共4页
Heilongjiang Electric Power
关键词
水电站
水轮发电机
安装
传统结构
装配
hydraulic power station
water turbogenerator
installation
traditional construction
assembly