摘要 南水北调西线第一期工程从长江上游调水40亿m^3,从水权角度分析了对长江中下游已建梯级电站的发电损失,提出了补偿措施。国务院批复《南水北调工程总体规划》中,南水北调西线工程规划调水170亿m^3,建议主管部门,对中下游新建或规划的梯级电站,根据已减少的径流量调整开发目标以减少影响和损失。 Water diverted from the first stage of west route of south to north water transfer project from the upstream Changjiang River is about 4 billion m3. According to the power of water resources by the state considering, analysis energy will be loss for the stair hydropower plants built of midstream and downstream for the Changjiang River and will put forward the measures of supply again. When the State Council approved an official 《Overall Plan of the Project of Water Transfer from South to North》, the project of west route of water diversion that can be transferred from the Changjiang River is 17 billion m3 in it. As the stair hydropower plants of the midstream and downstream will be built and have been planned, the total annual runoff 17 billion m3 of the three reaches should be deducted and the development target for stair hydropower plants should be regulated.
作者 谈英武 崔荃
出处 《南水北调与水利科技》 CAS CSCD 2003年第4期8-9,27,共3页 South-to-North Water Transfers and Water Science & Technology
关键词 南水北调西线工程 梯级电站 不利影响 分析和建议 the project of the west route water transfer stair hydropower plants unfavorable influences analysis and proposition
  • 相关文献

参考文献1

  • 1.关于减少长江受西线南水北调引水后不利影响的初步研究[R].黄河水利委员会勘测规划设计研究院,1995..

同被引文献11

引证文献2

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部