长大隧道快速施工途径探索 被引量:11

Study on rapid construction methods for long and large tunnels
下载PDF
导出
摘要 为寻求长大隧道的快速施工的有效途径 ,秦岭隧道、东秦岭隧道、克老隧道进口等工程中对施工组织管理、施工技术应用和施工环境控制等多项技术综合应用的观念进行了一些探索 ,取得了一定成效 ,施工中创造了多项全国记录。 To find the effective method of rapid construction for long and large tunnels, in the projects of Qinling tunnel, East Qinling tunnel and the entrance section of Kelao tunnel, researches were carried out for the comprehensive application of construction organization and management, new construction techniques and the control of construction environment . Some achievements were obtained and some national records were created during construction.
作者 胡守正
出处 《现代隧道技术》 EI 2003年第4期59-62,共4页 Modern Tunnelling Technology
关键词 长大隧道 快速施工 施工管理 技术应用 环境控制 Long and large tunnels Rapid construction Construction management Applied techniques Environment control
  • 相关文献

参考文献4

  • 1中铁一局集团公司.秦岭特长隧道平导坚硬岩钻爆法独头快速施工技术研究报告[R].,1998..
  • 2中铁一局集团五公司.东秦岭铁路隧道快速施工综合技术研究报告[R].,1998..
  • 3刘旭全 等.秦岭特长隧道Ⅱ线进口平导施工管理[J].铁道工程学报,1998.
  • 4胡守正,和民锁.克老隧道进口快速施工技术[J].现代隧道技术,2002,39(4):57-61. 被引量:1

同被引文献48

引证文献11

二级引证文献25

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部