为寻求长大隧道的快速施工的有效途径 ,秦岭隧道、东秦岭隧道、克老隧道进口等工程中对施工组织管理、施工技术应用和施工环境控制等多项技术综合应用的观念进行了一些探索 ,取得了一定成效 ,施工中创造了多项全国记录。
To find the effective method of rapid construction for long and large tunnels, in the projects of Qinling tunnel, East Qinling tunnel and the entrance section of Kelao tunnel, researches were carried out for the comprehensive application of construction organization and management, new construction techniques and the control of construction environment . Some achievements were obtained and some national records were created during construction.