Croesor power station restored
-
1世界消息[J].国际水力发电,1995,47(1):44-48.
-
2信息平台[J].中国电业,2010(3):79-79.
-
3蒲俊,曹海丽.丰满大坝重建玄机[J].新世纪周刊,2011(23):88-91.
-
4James Yang,Nils Johansson.Sediment Problem at Alvkarleby Power Station[J].Small Hydro Power News,2006,23(1):25-28.
-
5郭振胜,孙明权.垫层材料对超贫胶结材料坝面板应变的影响[J].黑龙江大学工程学报,2012,3(3):16-19.
-
6Ammar Hatem Kamel Issam Mohammed Ayad Sulaiby Mustaffa.Effects of Depression of Water Level in the Euphrates River in Iraq on the Operation of AI-Anbar Thermal Power Station[J].Journal of Civil Engineering and Architecture,2013,7(3):350-363.
-
7WANG Tiefeng Northeast Investigation, Design and Research Institute, China ZHANG Zhi Northeast Investigation, Design and Research Institute, China YI Yue Northeast Investigation. Design and Research Institute, China.SEDIMENTATION STUDY ON PUMPED-STORAGE POWER STATION OF PUSHI RIVER[J].International Journal of Sediment Research,1997,12(3):249-255.
-
8夏振尧,许文年.Ecological characteristics of artificial vegetation communities on excavated slopes at the Xiangjiaba hydroelectric power station[J].Journal of Chongqing University,2009,8(2):75-81. 被引量:3
-
9Sun, Fengzhong, Shan, Bo, Li, Shuying, Huang, Xinyuan.WATER HAMMER ANALYSIS OF WATER FEEDING SYSTEM IN COAL FIRED POWER STATION AND ITS INFLUENCE ON THE SAFETY OF OPERATION[J].Journal of Hydrodynamics,1997,9(3):87-91. 被引量:1
-
10S.J.P.S. Mariano,M.R.A. Calado,L.A.F.M. Ferreira.Profit-Based Optimal Operation of a Head-Dependent Hydroelectric Power Station in the Bilateral Market[J].Journal of Energy and Power Engineering,2011,5(5):466-473.