摘要
网络控制技术是在一定的约束条件下 ,按既定的目标对网络计划进行不断检查、评价、调整和完善的过程。在某市汶河大桥施工过程中 ,运用网络控制技术 ,综合各种情况 ,压缩计算工期 ,以达到要求工期的目标 ,并有效地进行了进度和质量控制。
The network control technology is a course of continuously inspecting, evaluating, adjusting and perfecting the network plan in accordance with the set objective in a certain restrain condition. In the construction of Wenhe Bridge in a city the network control technology is used to sum up various conditions, cut down the calculated working stage so as to reach the object of the required working stage and effectively finish the schedule and quality control.
出处
《城市道桥与防洪》
2003年第4期83-84,共2页
Urban Roads Bridges & Flood Control