摘要
本文针对苏州河综合整治某新建防汛墙工程实例 ,通过原位试验方法对低桩承台微型桩基桩土共同作用机理进行了初步的分析和讨论。
The paper analyzes and discusses preliminarily the mechanism of action together of miniature pile foundation pile with the soil at low pile cap by testing method of original position in a newly built flood-control wall project of the Suzhou River Comprehensive Regulation.
出处
《城市道桥与防洪》
2003年第4期89-91,共3页
Urban Roads Bridges & Flood Control