摘要
在南方一些经济较发达的省份,水利工程中越来越多采用高强度的预应力管桩作基础。本文探讨管桩基础与水工建筑物薄底板间的优化处理,以期获得良好的技术经济指标。
More and more prestressed high strength concrete piles are used as ground works in the water conservancy constructions in some southern developed provinces. The optimal treatment of the piles and thin platter of hydraulic structure, so as to acquire better technical economy index are discusses in this paper.
出处
《西北水力发电》
2003年第2期45-46,53,共3页
Journal of Northwest Hydroelectric Power
关键词
预应力管桩
底板
挡土墙
pre-stressed piles
flatter
retaining wall