期刊文献+

应用改进BP网络对潼关高程的预测 被引量:2

Application of improved BP network model in predicting the riverbed elevation of Tongguan
下载PDF
导出
摘要 作者在分析了影响汛前和汛后潼关高程变化值的因素的基础上,利用改进BP网络模型对非特征汛期和汛期潼关高程的变化值进行了计算。计算中不采用潼关的绝对高程,而用高程的变化量作为网络的较出物正量,从而减少计算误差,同时又能客观地考虑各影响因子的作用。改进后的BP模型学习时间短,精度满足要求。用该模型计算的潼关高程变化趋势与实际水库调度运行中的高程基本吻合。 On the basis of the analysis of factors affecting the riverbed elevation at Tongguan section of Wei River in Sanmenxia reservoir,the improved BP network model is applied to calculate the variation of the elevation in flood season and dry season respectively.In the model,instead of absolute elevation the variation of elevation is adopted as the output characteristic quantity of the network.For this reason,the calculation error is reduced and the influences of the factors affecting the elevation can be taken into account objectively.The predicted elevation variation is in good agreement with the observation data.
出处 《水利学报》 EI CSCD 北大核心 2003年第8期96-100,共5页 Journal of Hydraulic Engineering
基金 国家自然基金资助项目(59979020) 教育部青年骨干教师基金资助
关键词 BP网络模型 高程变化量 三门峡 潼关 库区 预测 汛期 improved BP network model variation of riverbed elevation Tongguan river section Sanmenxia hydro project
  • 相关文献

参考文献7

  • 1楼顺天 施阳.基于MATLAB的系统分析与设计——神经网络[M].西安:西安电子科技大学出版社,2000..
  • 2楼顺天 施阳.基于MATLAB的系统分析与设计--神经网络[M].西安:西安电子科技大学出版社,2000..
  • 3缪风举.洪水排沙平水发电-三门峡水库汛期发电运用方式的研究[A]..三门峡水利枢纽运用四十周年论文集[C].郑州:黄河水利出版社,2000.12.
  • 4张仁.潼关高程升高及其解决方法[A]..三门峡水库枢纽运用四十周年论文集[C].郑州:黄河水利出版社,2000.12.
  • 5焦恩泽 侯素珍 等.潼关高程演变规律及其成因分析[A]..三门峡水库枢纽运用四十周年论文集[C].郑州:黄河水利出版社,2000.12.
  • 6张金良 王育杰.汛期潼关高程与其影响因子相关分析[A]..三门峡水库枢纽运用四十周年论文集[C].郑州:黄河水利出版社,2000.12.
  • 7缪凤举.洪水排沙平水发电-三门峡水库汛期发电运用方式的研究[A]..三门峡水利枢纽运用四十周年论文集[C].郑州:黄河水利出版社,2000.12.

共引文献22

同被引文献22

引证文献2

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部