摘要
“十一五”期间三峡送电湖南容量将达到2500MW,研究表明,为保证三峡电能的安全稳定送出,必须发展湖南500kV主干网架的发展,而湘鄂之间的第3回500kV联络线采用湖北潜江至湖南岳阳方案较为有利。
The power-transfer capability from Three Gorges to Hunan will reach 2.5 GW in the Eleventh Five-Year PlanPeriod. Researches show that, with the development of 500kV key power network of Hunan province, building the third500kV tie-line from Qianjiang of Hubei province to Yueyang of Hunan province is of great advantages in order to ensura safe and stable electric power transmission.