期刊文献+

南水北调东线东平湖水库工程地质条件综述 被引量:1

Engineering Geological Conditions of the Dongpinghu Reservoir on the East Route Project of SNWT
下载PDF
导出
摘要 东平湖是黄河下游重要的防洪工程,同时也是南水北调东线重要的调蓄水库。随着南水北调东线的开工建设,它肩负着向济南及山东半岛供水的调节任务,同时还承担向河北省、天津市供水的任务,因此其战略地位非常重要。本文从工程地质这一基础性工作角度论述东平湖现状情况下的工程地质条件和所存在的工程地质问题,提出工程处理措施。 Dongpinghu Reservoir is a key flood control project in the downstream of the Yellow River, and it is also a storage reservoir on the east route of the South - North Water Transfer Project (SNWTP). After the construction of the east route of SNWTP, the reservoir will adjust the water supply to Jinan and Shandong and solve the water shortage problems in Hebei and Tianjin. It is therefore playing a very important role in SNWTP. From the engineering geology point of view, this paper will discuss the engineering geological condition and engineering geological problems in Dongpinghu Lake and propose appropriate treatment measures for it.
作者 张怀军
出处 《南水北调与水利科技》 CAS CSCD 2003年第3期14-17,共4页 South-to-North Water Transfers and Water Science & Technology
关键词 东平湖 围堤 工程地质 加固 Dongpinghu Lake border dike engineering geology reinforce
  • 相关文献

参考文献2

  • 1张锡令 等.南水北调东线可行性研究阶段东平湖水库工程地质勘察报告[R].天津:水利电力部天津勘测设计院,1988..
  • 2.GB50287-99,中华人民共和国国家标准.水利水电工程地质勘察规范[S].北京:中国计划出版社,1999..