摘要
针对混凝土试件试压中出现的问题 ,阐述了施工现场混凝土试模时加强对采购、使用、维护和保养等方面的管理 ,提出了应当采取的措施 。
according to the problems existed in pressure test of concrete sample some countermeasures are proposed. Author points out that the management in materials purchase, operation and maintenance in concrete mould test process should be intensified to ensure the test quality.
出处
《山西建筑》
2003年第8期108-109,共2页
Shanxi Architecture