摘要
介绍了扣式插板解决双壁钢围堰河床定位过程中插板的结构设计和计算问题 ,结合钢围堰施工实例 ,指出了采用扣式插板能降低施工成本和加快施工进度 ,是一种经济、快速。
In this paper structure design and checking calculation of insert plate are introduced when the clip insert plate is applied in double wall cofferdam construction on inclined river bed. Combined with practical works author points out that the use of the clip insert plate is an economic, safe and effective method to reduce construction cost and shorten limit time.
出处
《山西建筑》
2003年第9期55-56,共2页
Shanxi Architecture
关键词
插板
双壁钢围堰
堵漏
封底
河床
施工成本
insert plate, double wall steel cofferdam, stop leakage, floor sealing