摘要
本文结合阜新闹德海引水工程运行实际资料,阐述高浊度术的沉降机理,提出浑液面沉速的概念,并说明了辐流沉淀池是处理高浊度水合理的构筑物,及其相应改进措施。
This paper presents precipitation mechanism of high turbidity water and puts forward the concept of sinking velocity for muddy liquid surface combining the operation information of Naodehai diversion work in Fuxin City. Spider flow precipitation pool is proved a reasonable structure to handle high turbidity water.
出处
《吉林水利》
2003年第8期23-25,共3页
Jilin Water Resources