神华工程是党的十四大提出的以煤炭开发为核心的特大型能源开发项目,朔黄铁路是神华工程的重要组成部分。神华集团在朔黄铁路建设中,始终坚持以科技进步为动力,优化设计及施工方案,严格落实项目法人负责制、招投标制、工程监理制和合同管理制,实现了工期提前、工程质量优良和投资节约。在铁路运营方面,实现了运营模式创新、运输机制创新、机构设置创新及用人与分配制度创新,获得了很好的经济效益。朔黄铁路建设和运营的成功,为我国铁路建设和运营,特别是合资铁路的建设和运营提供了值得借鉴的模式。
Shen Hua project is the large-scale energy sources development project presented at the Fourteenth NationalCongress of Chinese Communist Party whose emphasis is coal exploitation. And Suozhou-Huanghuagang railway isthe important part of Shen Hua Project. During the construction of Suozhou-Huanghuagang railway, Shen Hua Groupbased on the scientific development, optimized the design and construction plan, strictly carried out the projectresponsibility system, inviting bidding and bid system, supervision system of the project and contact managementsystem and complete the construction ahead of schedule, ensured good engineering quality and solved the investment.As for the railway operation, it realized the innovation in operation mode, transport system, framework setting anddistribution system obtaining good economic benefits. The success of Suozhou-Huanghuagang railway constructionand operation provides the construction and operation of Chinese railway, as well as the joint-stock railways withreferenced mode.
出处
《中国铁路》
北大核心
2003年第8期15-17,共3页
China Railway