本文以一个工程实例介绍了在杭州地区生产、供应和浇筑C35P10大体积混凝土时,根据杭州地区的原材料特性选用原材料、备料、供应;配备生产设备、维护保养、确保无故障生产;合理配备搅拌运输车和泵送设备;采取有效、合理的技术措施和质量控制措施;建立有效的组织供应体系;和施工单位积极、有效的配合;怎么样来有效控制有害的温度裂缝;给施工单位提出合理的建议等几方面,做有效的、合理的预案,以便顺畅、优质的完成混凝土的生产、供应、浇筑任务。
In this paper, by an engineering example is introduced in the Hangzhou area of production, supply and C35 P 10 volume at the concrete pouring, how to choose the raw material preparation, raw material supply, according to the characteristics in Hangzhou area; how to dispose the production equipment, maintenance, ensure trouble free production; how to reasonably equipped with mixing truck and pumping equipment; how to take technical measures and quality control measures are effective, reasonable; how to establish the effective system of organization of supply, with how and construction units active, effective; how to effectively control the temperature crack harmful; how to give the construction unit and put forward reasonable suggestions and so on several aspects, effective, reasonable plan. In order to complet the production, supply, and pouring task of concrete smoothly.
出处
《商品混凝土》
2015年第6期61-65,共5页
Ready-Mixed Concrete
关键词
大体积混凝土
设备配备
温度裂缝
水化热
质量控制措施
large volume concrete
equipment
temperature crack
hydration heat
quality control measures