摘要 某综合办公楼地下室和屋面采用补偿收缩混凝土结构自防水和聚氨脂涂膜双防水措施,地下结构、地上结构施工均采用补偿收缩混凝土超长结构连续施工技术。结合工程实际情况,通过保证膨胀剂限制膨胀率≥0.08%,优化混凝土配合比,合理设置膨胀加强带,在保证防水质量前提下,加快施工进度。 Shrinkage-compensating concrete structure waterproof and polyurethane coating double waterproof measures were adopted in basement and roof of an office building. Super-long structure continuous construction technology of shrinkage-compensating concrete was also used in both of underground structure and overground structure construction. Combined to the practical situation, by selecting expansive agent for concrete with restrained expansion rate ≥0.08%, optimizing mix proportion of concrete and setting expansion reinforcing band, schedule of construction is speeded up under the precondition of keeping good waterproof quality.
出处 《商品混凝土》 2016年第2期63-65,共3页 Ready-Mixed Concrete
关键词 防水 超长结构连续施工技术 补偿收缩混凝土 膨胀加强带 waterproof super-long structure continuous construction technology shrinkage-compensating concrete expansion reinforcing band
  • 相关文献

参考文献5

二级参考文献4

共引文献20

同被引文献7

引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部