成都双铁下穿工程咬合桩C30超缓凝混凝土的制备及应用

Preparation and application of C30 super retarding concrete in secant pile of Chengdu double iron project
原文传递
导出
摘要 本文根据成都双铁下穿工程咬合桩对混凝土的技术性能要求,开展了超缓凝混凝土的凝结时间、工作性能及力学性能试验研究,研制出性能稳定的C30超缓凝混凝土,其初凝时间大于60h,工作性能良好,3d强度小于3MPa,28d强度大于30MPa,满足工程设计要求,并在工程中成功应用,取得较好的社会、经济效益。 According to the technology properties requirements of secant pile in Chengdu double iron project,this paper carried out the setting time,working performance and mechanical performance test research of super retarding concrete,and prepared the C30 super retarding concrete with stable performance,the initial setting time is larger than 60 hours,the working performance is good,the strength of 3 days is less than 3MPa,and the strength of 28 days is larger than 30 MPa.It can meet the engineering design requirements,and is successfully applied in the project.Achieved good social and economic benefits.
出处 《商品混凝土》 2017年第3期62-64,共3页 Ready-Mixed Concrete
关键词 超缓凝混凝土 咬合桩 凝结时间 质量控制 retarding concrete secant pile setting time quality control
  • 相关文献

参考文献7

二级参考文献18

  • 1韩爱民,肖军华,梅国雄.被动桩中土拱效应特征与影响参数研究[J].工程地质学报,2006,14(1):111-116. 被引量:36
  • 2益德清.深基坑支护工程实例[M].北京:中国建筑工业出版社,1996..
  • 3GB50204-2002.混凝土结构工程施工质量验收规范[S].[S].,2002..
  • 4贾兆武等.RCC超缓凝复合外加剂的试验研究[M].西安
  • 5王亚强超缓凝混凝土在深钻孔咬合桩中的配合比设计及应用[M].杭州
  • 6GB50208-2002.地下防水工程质量验收规范[S].[S].,..
  • 7GB50108-2001.地下工程防水技术规范[S].[S].,..
  • 8昆明捷程桩工有限责任公司.钻孔咬舍桩施工技术介绍及工程实例应用证明[R].昆明,2006.
  • 9昆明捷程桩工有限责任公司,中冶集团建筑研究院.捷程MZ系列全套管灌注桩和钻孔咬合桩成套技术研究与开发报告[R].昆明,2005.
  • 10北京城建设计研究总院.南京地铁一号线南延线河定桥站主体围护结构设计[R].北京,2006.

共引文献46

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部