摘要
结合工作实践,总结了火电建设项目环境影响评价中应关注的问题。还介绍了火电行业规划、环保规划、污染物总量控制要求、宜采取的污染防治措施等。
Based on the author′s work, some problems on those care should be taken in environment impact assessment of a coalfired power project are raisen and some solving methods are given. Moreover,the power industry plan,environment protection plan,total emission control and control measures are introduced.
出处
《电力环境保护》
2003年第3期4-5,共2页
Electric Power Environmental Protection
关键词
火电项目
环境影响
评价
coal-fired power project
environmental impact
assessment