摘要
本文介绍了新疆奎屯至赛里木湖公路工程第九合同段K4 0 6 +0 0 0~K4 0 8+2 0 0段工程地质和水文地质 ,着重阐述了盐沼软土段地基的处治方法 。
The article introduces enginering and hydrology geology with NO.9 contract segment of highway from kui Tun to Sai Li Mu lake in XinJiang. The paper presents settling method of salt-marsh soft soil,Construction craft and up-down prognosticate resuct.
出处
《辽宁省交通高等专科学校学报》
2003年第3期11-12,14,共3页
Journal of Liaoning Provincial College of Communications