摘要
主要介绍了某学校宿舍楼纠偏、加固的设计方法,步骤及施工、检测要求。通过对建筑物产生倾斜的原因进行分析,提出纠偏设计的方案和计算的简要方法以及掏土纠偏的效果估算,并详细阐述纠偏加固施工的技术要求和监测技术要求,最后作出分析和结论。
This article introduces not only the design means and procedure, but also the execution and test requirements on how to correct and reinforce one declined school dormitory. Upon the analysis on the reasons of building declination, the declination-correction design plan, the calculation way and the effectual evaluation of digging soil and correcting declination are proposed. Meantime, this article discusses the detailed execution and test requirements of declination correction and reinforcement, finally, the conclusion is made.
出处
《河南科学》
2003年第5期528-532,共5页
Henan Science
关键词
纠偏
加固
锚杆静压桩
掏土纠偏
declination correction
reinforce
anchor pile
dig