摘要 207国道某涵洞西端拱脚落在人工填土上,且地基实际承载力不能满足设计要求,导致涵洞差异沉降,顶部出现裂缝。采用无砂混凝土小桩技术加固,沉降监测结果显示了这种技术的优势。施工实践表明:施工过程要严格控制冲孔的用水量,回填土的时间和速率应根据小桩的强度发展确定,以防止沉降量的增大。 The west foot of a culvert locating in 207 National Highway is supported on the human fillings, and the load bearing capacity was over estimated in the process of designing, which resulted in the differential settlement and consequent cracking on the top arch. The foundation is processed by nonaggregate minipile, and the following survey shows its effectiveness. It is suggested that the amount of water should be strictly controlled and the back fill should be controlled in a valid pace.
出处 《河南科学》 2003年第5期584-586,共3页 Henan Science
关键词 涵洞 沉降 裂缝 无砂混凝土小桩 culvert settlement crack non-aggregate mini-pile technology
  • 相关文献

参考文献4

  • 1.GB 50007-2002.建筑地基基础设计规范[S].,..
  • 2.JGJ/ T 8-97.建筑变形测量规程[S].,..
  • 3GB 50007—2002.建筑地基基础设计规范[S].[S].,..
  • 4JGJ/T 8—97.建筑变形测量规程[S].[S].,..

共引文献21

同被引文献13

引证文献2

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部