摘要
国内外机电行业历经数10年,特别是自上世纪80年代初期以来,对三峡左岸电站水轮机机组展开了大规模的研究、设计、制造、安装等工作,取得了重大突破。对1992年4月全国人大通过兴建三峡工程以来,三峡左岸水轮机的研究、招标采购和总体设计及合同实践作了简要回顾。
For decades of years, especially since in the early 1980s, engineers from the electromechanical trade at home and abroad have made great efforts in research, design, manufacture, installation, etc. for turbines in the left powerhouse at Three Gorges project, and made significant breakouts. The author makes overall review of research, bidding and procurement, integral design as well as contract execution for turbines since voting for construction of the Three Gorges project on the National People's Congress in April 1992.
出处
《中国三峡建设》
2003年第7期24-28,共5页
China Three Gorges Construction