期刊文献+

丹江口重力坝二期加高非线性有限元接触分析 被引量:5

Nonlinear FEM Contact Research on Danjiangkou Gravity Dam Heightened During Post-period
下载PDF
导出
摘要 为了论证大坝加高后坝体联合剖面的变形及稳定是否满足要求,利用变分原理和最小位能原理将非线性有限元接触问题转化为标准的凸二次规划问题,然后采用基于扩展拉格朗日方法的序列二次规划优化法求解,重点研究了新老混凝土界面不同连结情况下的大坝应力、变形和稳定性状。计算结果表明,大坝加高后的整体变形、坝址坝踵和接触缝键槽处的应力以及整体稳定安全系数均满足设计要求。 In order to prove whether the deformation and stabilization of the whole dam section after heightening meet the demand of design, this paper transforms a nonlinear FEM contact problem to standard convex quadratic programming by use of differential principle and principle of minimum potential energy. Then, this paper analyzes and computes the stress, deformation and stabilization at different contact state of new old concrete interface by use of sequential quadratic programming (SQP) method of contact algorithm, based on augmented Lagrange procedure. The computation results show that the stress, deformation and stabilization all meet with general rules and design demand.
出处 《水电能源科学》 2003年第3期55-58,75,共5页 Water Resources and Power
关键词 重力坝 加高 非线性有限元 接触分析 gravity dam dam heightening nonlinear FEM contact analyzing
  • 相关文献

参考文献4

二级参考文献8

  • 1陈万吉.用有限元混合方法分析弹性接触问题[J].大连工学院学报,1979,2:16-18.
  • 2钟万勰,参变量变分原理及其在工程中的应用,1997年
  • 3李兴斯,中国科学.C,1991年,22卷,1283页
  • 4Hung N D,Comput Struct,1980年,11卷,55页
  • 5陈万吉,大连工学院学报,1979年,2卷,16页
  • 6范天佑.经典弹性理论中的接触问题[M].北京:北京理工大学出版社,1992.
  • 7蒋友琼.非线性有限元法[M].北京:北京工业学院出版社,1988.
  • 8李兴斯.解非线性规划的凝聚函数法[J].中国科学(A辑),1991,22(12):1283-1288. 被引量:80

共引文献9

同被引文献34

引证文献5

二级引证文献20

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部