摘要
阐述了轴流转桨式水轮机转轮静平衡试验基本原理,并对传统计算方法进行了改进,提出了在水电厂现场进行水轮机转轮静平衡试验时应注意的问题。介绍了葛洲坝水电厂水轮机转轮静平衡试验计算机辅助处理软件,对该软件的功能以及在水电厂的应用情况作了简要说明。
This paper expounded the fundamental calculation method of Kaplan runner static balance test and proposed improvement for the traditional methods. Problems which should be noticed for static balance test of Kaplan runner at hydropower plant are put forward. It introduced the Gezhouba Runner Balance Computer Aided Processing (GRBCAP) system, and made the brief explanation to the functions of GRB-CAP system and its application at hydropower plant finally.
出处
《水电能源科学》
2003年第3期73-75,共3页
Water Resources and Power