延长维修间隔 降低维修成本
被引量:2
Less Maintenance, Less Cost
摘要
延长维修间隔可有效地降低维修成本。本文主要介绍空中客车公司对其所生产的远程、单通道、宽体等几种类型飞机制定维修计划,延长维修间隔的情况。
出处
《航空维修与工程》
北大核心
2003年第5期47-48,共2页
Aviation Maintenance & Engineering
二级参考文献10
-
1王彤.空调器寿命的可靠性分析探讨[J].家电科技,2005(6):49-51. 被引量:1
-
2DEKKER R,van der DVyn Schouter F A,Wildeman R E.A review of multi-component maintenance models with economic dependence[J].Mathematical Methods of Operations Research,1997,45(3):411-435.
-
3ARCHIBALD T W,DEKKER R.Modified block replacement for multiple component systems[R].Technical Report9412/A,1994
-
4DEKKER R,ROELVINK I F K.Marginal cost criteria for preventive replacement of a group of components[J].European Journal of Operational Research,1995,84 (2):467-480.
-
5You-tern Tsai,Kuo-shong Wang,Lin-chang Tsai.A study of availability-centered preventive maintenance for multicomponent systems[J].Reliability Engineering and System Safety,2004,84(3):261-270.
-
6未来中国通用航空业分析预测报告[R].2005.
-
7香港航空公司某机型维修方案[Z],2002.
-
8张文修,吴伟志.粗糙集理论介绍和研究综述[J].模糊系统与数学,2000,14(4):1-12. 被引量:234
-
9张勇,曹先常.基于遗传算法的系统维修性优化分配方法研究[J].华东电力,2003,31(1):12-14. 被引量:3
-
10克理斯琴.德尔马斯.延长维修间隔 降低维修成本[J].航空维修与工程,2003(5):47-48. 被引量:2
共引文献33
-
1吕文元,郑睿,张乐.非齐次缺陷发生率情况下时间延迟模型比较研究[J].计算机集成制造系统,2008,14(8):1529-1532. 被引量:7
-
2王灵芝,徐宇工,张家栋.以可靠性为中心的多部件系统预防性维修优化研究[J].计算机集成制造系统,2008,14(10):2042-2046. 被引量:28
-
3王灵芝,徐宇工,张家栋.基于设备有效度和可靠度的预防修经济优化模型[J].机械工程学报,2010,46(4):163-168. 被引量:43
-
4郑睿,吕文元.自动生产线的同步维修模型及实例研究[J].中国管理科学,2011,19(1):119-125. 被引量:13
-
5白永生,贾希胜,程中华.复杂系统复合维修间隔期优化模型[J].火力与指挥控制,2011,36(9):19-22. 被引量:7
-
6李欣玥,贾云献,白永生.基于预防性维修工作组合的维修等级优化研究[J].指挥控制与仿真,2012,34(1):115-118. 被引量:6
-
7杨元,黎放,刘振宇,张宝华.基于相关性的系统预防性维修任务成组优化[J].武汉大学学报(工学版),2012,45(4):539-544. 被引量:8
-
8李欣玥,贾云献,白永生.预防性维修工作组合优化[J].火力与指挥控制,2013,38(2):35-39. 被引量:1
-
9李欣玥,贾云献,白永生.预防性维修工作组合优化[J].火力与指挥控制,2013,38(4):39-43. 被引量:4
-
10吕文元,张新波,樊玉杰.基于“维修费用—可靠性”的自动生产线同步维修模型[J].计算机集成制造系统,2013,19(12):2954-2959. 被引量:4
同被引文献11
-
1王彤.空调器寿命的可靠性分析探讨[J].家电科技,2005(6):49-51. 被引量:1
-
2Christer A H,Lee C,Wang W.A Data Deficiency Based Pa-rameter Estimating Problem and Case Study in Delay Time PM Modeling[J].International Journal of Production Economics,2000,67(1):63-76.
-
3Christer A H.Development in Delay Time Analysis for Modeling Plant Maintenance[J].Journal of the Operational Research Soci-ety,2000,50(11):1120-1137.
-
4DEKKER R,van der DVyn Schouter F A,Wildeman R E.A review of multi-component maintenance models with economic dependence[J].Mathematical Methods of Operations Research,1997,45(3):411-435.
-
5ARCHIBALD T W,DEKKER R.Modified block replacement for multiple component systems[R].Technical Report9412/A,1994
-
6DEKKER R,ROELVINK I F K.Marginal cost criteria for preventive replacement of a group of components[J].European Journal of Operational Research,1995,84 (2):467-480.
-
7You-tern Tsai,Kuo-shong Wang,Lin-chang Tsai.A study of availability-centered preventive maintenance for multicomponent systems[J].Reliability Engineering and System Safety,2004,84(3):261-270.
-
8未来中国通用航空业分析预测报告[R].2005.
-
9香港航空公司某机型维修方案[Z],2002.
-
10张文修,吴伟志.粗糙集理论介绍和研究综述[J].模糊系统与数学,2000,14(4):1-12. 被引量:234
二级引证文献36
-
1吕文元,郑睿,张乐.非齐次缺陷发生率情况下时间延迟模型比较研究[J].计算机集成制造系统,2008,14(8):1529-1532. 被引量:7
-
2王灵芝,徐宇工,张家栋.以可靠性为中心的多部件系统预防性维修优化研究[J].计算机集成制造系统,2008,14(10):2042-2046. 被引量:28
-
3王灵芝,徐宇工,张家栋.基于设备有效度和可靠度的预防修经济优化模型[J].机械工程学报,2010,46(4):163-168. 被引量:43
-
4郑睿,吕文元.自动生产线的同步维修模型及实例研究[J].中国管理科学,2011,19(1):119-125. 被引量:13
-
5白永生,贾希胜,程中华.复杂系统复合维修间隔期优化模型[J].火力与指挥控制,2011,36(9):19-22. 被引量:7
-
6李欣玥,贾云献,白永生.基于预防性维修工作组合的维修等级优化研究[J].指挥控制与仿真,2012,34(1):115-118. 被引量:6
-
7杨元,黎放,刘振宇,张宝华.基于相关性的系统预防性维修任务成组优化[J].武汉大学学报(工学版),2012,45(4):539-544. 被引量:8
-
8李欣玥,贾云献,白永生.预防性维修工作组合优化[J].火力与指挥控制,2013,38(2):35-39. 被引量:1
-
9李欣玥,贾云献,白永生.预防性维修工作组合优化[J].火力与指挥控制,2013,38(4):39-43. 被引量:4
-
10吕文元,张新波,樊玉杰.基于“维修费用—可靠性”的自动生产线同步维修模型[J].计算机集成制造系统,2013,19(12):2954-2959. 被引量:4
-
1包丽,韩冰冰,包健波.民用飞机初始主最低设备清单的制定[J].科技创新导报,2013,10(10):55-58. 被引量:3
-
2张卓,高鹰,李宝鹏,张杰.航空装备事后维修策略研究[J].航空科学技术,2009,20(2):14-15.
-
3蒋陵平,付尧明,杨元宗.通用航空PA44飞机发动机起动机可靠性分析[J].机械设计与制造,2012(8):121-123. 被引量:3