摘要
研究了大跨度钢管混凝土拱桥拱肋吊装过程中的几何非线性问题 ,在此基础上编制了索、梁、杆平面结构系统的几何非线性静力分析程序。同时根据施工控制理论在前进算法的基础上采用自行编制的程序 ,对工程实例——恩施州南里渡大桥拱肋吊装过程进行了模拟计算 。
This paper is concentrated on the geometric nonlinear static analysis of the rib hoisting for concrete filled steel tubular(CFST) long span arch bridges. And a geometric nonlinear static finite element analysis program of cables, bars and beams is presented. Based on the progressive algorithm, the program of the finite element considering geometric nonlinear condition has been made to analyze the construction process of rib hoisting forecasting, which is given in Nannidu Arch Bridge in Enshi.
出处
《武汉理工大学学报》
CAS
CSCD
2003年第9期40-42,共3页
Journal of Wuhan University of Technology
基金
湖北省科技攻关项目 ( 2 0 0 11g0 0 37)
关键词
钢管混凝土拱桥
拱肋吊装
几何非线性分析
施工控制
CFST arch bridge
rib hoisting
geometric nonlinear static analysis
construction control