摘要 通过分析公伯峡水电站施工渡汛的影响因素,确定龙羊峡水库的运行方式是影响施工渡汛的主要因素。针对龙羊峡水库的实际运行情况,着重研究了龙羊峡水库不同运行方式对公伯峡水电站施工渡汛的影响,给出了合理的渡汛方案。 The factors which affect flood handling during construction period of Gongboxia hydropower station have been analysed and the operation mode of Longyangxia reservoir has been considered as the main factor.Based on the real operation condition of Longyangxia reservoir, the influence of different operation modes of Longyangxia reservoir on flood handling during construction period of Gongboxia hydropower station is has been intensively studied, and the rational scheme has been proposed.
出处 《西安理工大学学报》 CAS 2003年第2期135-138,共4页 Journal of Xi'an University of Technology
基金 国家重点基础研究发展规划资助项目(G1999043608) 陕西省重点实验室资助项目(02JS37)。
关键词 水电站 施工渡汛 洪水调度 hydro-power station flood handling during construction period flood dispatch
  • 相关文献

参考文献2

二级参考文献9

  • 1王卓甫,水利学报,1989年,11期
  • 2朱本仁,蒙特卡罗方法引论,1987年
  • 3陈守煜,水利学报,1980年,2期
  • 4团体著者,水文学的概率统计基础,1980年
  • 5黄强.水能利用[M].北京:水力水电出版社,1996..
  • 6黄强,水能利用,1996年
  • 7许自达,水电站水库调度与运行管理,1994年
  • 8冯尚友,水资源系统工程,1991年
  • 9Qing Liang,Water Resources Bulletin,32卷,2期

共引文献29

同被引文献14

引证文献2

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部