摘要
万家寨引黄工程南干二级泵站竖井混凝土衬砌采用了液压式滑模施工,本文介绍了滑模的结构和安装,并叙述了滑模的施工工艺流程和方法。
The hydraulic slipform constructio n method is used in the conrcete linin g construction of the shaft in the second pumping station of the south main line,the YRDP.In this paper,the structure,installation and constr uction technique of the slipform construction is introduced in cletail.
出处
《山西水利科技》
2003年第3期62-63,共2页
Shanxi Hydrotechnics