期刊文献+

预应力锚索在十三陵抽水蓄能电站上池西北坡加固中的应用

APPLICATION OF PRESTRESSING FORCE ANCHORED CABLE IN THE FASTENING THE NORTHWESTERN SLOPE OF SHISANLING PUMPED STORAGE POWER STATION
下载PDF
导出
摘要 十三陵抽水蓄能电站上池位于蟒山山顶,不仅蓄水发电,而且作为"天池"为十三陵游览区增加了又一新的景色供游人观赏。本文以十三陵抽水蓄能电站上池西北坡塌滑体锚索锚固为例,系统论述了预应力锚索在地质灾害防治中的应用。 The upper reservoir of Shisanling pumped storage power station is located at the top of Mangshan Mountain.It is used not only for sluice and electricity generating,but also a new sight sport as 'sky pond' in Shisanling recreation area.Taking the anchoring of northwestern collapsebody at the upper reservoir of Shisanling pumped storage power station as an example,this paper systematically elaborate the application of prestressing anchored cable in of the prevention of geologic hazard.
出处 《地质力学学报》 CSCD 2003年第2期154-160,共7页 Journal of Geomechanics
关键词 预应力 锚索 加固 蓄能电站 地质灾害防治 Shisanling storage power station prestressing force anchored cable and anchoring
  • 相关文献

参考文献2

二级参考文献5

共引文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部