摘要
结合实践经验,并根据《防水卷材企业质量管理规程》要求,提出了3种生产规模下防水卷材生产线各系统的设备配置方式,供有关企业改造设备和新上生产线时参考。
In accordance with'regulations for quality man-age ment for waterproofing membrane enterprises'and coupled with practice,proposes device configuration requirements for waterproofing membrance production lines with three differ-ent capacities which can be used as reference in rinnova-tion or new line preparation.
出处
《中国建筑防水》
2003年第8期27-29,共3页
China Building Waterproofing