摘要
针对钱塘江赫山湾段涌潮影响大、涂面高程低的特点,阐述了围堰结构设计、围堰施工时促使钱塘江涂面自然淤高所采取的技术措施及围堰施工方法.
The paper talks about the methods and measures of cofferdam construction,specially about the cofferdam structure design in Heshan of Qiantangjiang River with strong tide and low surface coating.
出处
《浙江水利水电专科学校学报》
2003年第1期22-24,共3页
Journal of Zhejiang Water Conservancy and Hydropower College