1Jin-Fang Shr, M.ASCE1; Bin Ran, M.ASCE2; and Chiu Wei Sung3.(2004)"Method to Determine Minimum Contract Bid for A+B+I/D Highway Projects"JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT ASCE/JULY/AUGUST 509-516.
2Jin-Fang Shr,ASCE1 M,Bin Ran,ASCE2 M and Chiu Wei Sung.Method to Determine Minimum Contract Bid for A+ B+ I/ D Highway Projects[J].Journal of Construction Engineering and Management & Asce.July/August,2004:509-516.